Recent developments:

  • North sidewalks are poured.

  • Front canopy columns set.

  • Soil graded

  • North frieze board installed.

  • Windows all installed.

  • Drywall complete and primed and painting is underway.

  • Rear stoop has been removed.

  • Door frames and sidelites installed.

  • Data cables are pulled.

  • Ceiling started

  • Concrete walk and steps poured at south entrance