Highlights so far:
Interior demolition work is done.
Old pavement from parking lot and drive-through removed north of the building
Storefront window openings are being cut and framed in on the north side.
New windows on the south side are cut in.
Some minor framing work inside has begun.
We anticipate removing a portion of the interior wall between the north 1/3 and middle 1/3 to open the space up in the next month.